Casing Operation

The Rig Crew was in the process of running 5.5’’ casing with 3 rd party hydraulic power tongs and external Casing Running Tool (CRT), filling up the casing approximately every 1000’. The driller picked up a joint of casing… 

CRUSHED BY/CAUGHT BETWEEN FATALITY

Two personnel were performing loose lifting gear inspections around the riser deck area of an offshore…